Instructions for installation with 4 basic components of exclusive accessories:
1) Main Panel: The main panel is the largest panel to be installed. Most technicians recommend a series of panels begins along a wall or use a wall as a guide, because often the walls are not completely parallel, and can lead to a pole of attraction not misleading. If a project is finished with materials that offset is time to repair.
Before the start of the track, is a very practicalMeasurement of the wall on each side of the room and then make a point in the middle of the wall. Using a chalk snap line, "really helps. Next target adjacent walls, find the center and snap a second chalk line here.'ll Receive a chalk" T "section, which is in the middle of the points of space. Depending on the dimensions of the panels are installed, you can do with lines of chalk, or a distance measured from the center line, which is easy with a measuring tape can be done. Next. installation of a seriespanels along the length of the room. It 'very important for your first line should be aligned correctly, as it makes it easy to adapt to the panels below. Most of the technicians are installing the second row on one side of the midline row of panels, so that on the other hand, as the one on the opposite side and then work your way to the outer parts of the wall or ceiling. According to the technical This method is much simpler and more accurate work of a sidethe other side. Always install all your main panels, first back over the last 6-10 kg of surface covered by infill panels are not included.
2) Filler Panel: Filler slabs are then used to cover the details of the main panels do not have. You must use your panels are cut to filler. If you go to install the panels, so there are only about 1 foot or less of the area was discovered, is perfect. The protective panel is a bit 'hidden under the edge of the main panel. When you reachposition of the circumference of the seam of the protective panel main panel, while the pin through the panel for protection. If you have a strip of molding, using, not the filler panel must be hidden under the main panel can not change. Just make sure that the distance between the largest and the filler panel is larger strips of molding. It 'clear that the purpose of board and cover the holes.
3) Frame: Measure from the wall in the depth of the frame you want to use. Make a chalk line to determinebottom of the frame along the wall. Top shots from corner to corner wall. Miters can by hand, or a power miter box, cut with an abrasive disc. The frame has a finished edge will give you a visual guide for what purpose is being placed on the wall. The installation of a cone-head nails or nail panels rolled edge every 6 "The frame is to be installed on land or infill panels, depending on whether you are used to fill the panels.
4) Molding: The last and the easieststep is to install strips of molding. Put cages cast on the edge of the panels laminated box. This will be panels and in the thread.
Sorry, the comment form is closed at this time.